Bathroom remodeling
Kitchen remodeling
Home additions & ADU
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with







See the difference
Before
After
Before
After
Before
AfterHow Much Does Bathroom Remodel Cost in Paradise?
A bathroom remodel in Paradise typically costs $9,000 to $28,000, with most homeowners landing somewhere in the mid-teens for a full gut remodel of a standard hall or primary bath. A smaller cosmetic update – new vanity, fresh tile, refinished tub – can come in at $5,000 to $12,000. The number moves up or down based on footprint, how far we’re moving plumbing, and the finish level you pick.
That range is what we see in this market right now, and it’s why we price in line items instead of throwing out a single mystery figure. Keep reading for the 2026 breakdown, the specific things that push a Paradise bathroom toward the top of the range, and how to trim cost without cutting the parts that fail.
If you’d rather skip the guesswork, call us at (888) 445-6077 for a free estimate.
Bathroom Remodel Cost Breakdown (2026)
Here’s how the money splits across a full bathroom remodel in the Paradise market. Ranges are for a standard-size bath; larger primary suites run higher.
| Scope of Work | Typical Cost Range |
|---|---|
| Full bathroom remodel (standard bath) | $9,000 – $28,000 |
| Small bathroom remodel | $5,000 – $12,000 |
| Walk-in shower installation | $4,500 – $12,000 |
| Tub-to-shower conversion | $3,500 – $10,000 |
| Shower replacement (same footprint) | $3,000 – $8,500 |
| Bathroom vanity installation | $800 – $3,000 |
What pushes a job toward $28,000 instead of $9,000? Three things dominate: moving or adding plumbing fixtures, upgrading to natural stone or large-format tile, and replacing the tub with a fully waterproofed walk-in shower. On the other end, a project comes in lower when the layout stays put, the tile is a standard porcelain, and the vanity and fixtures are mid-range.
The shower line items are where we spend the most time talking homeowners through the number. A $4,500 walk-in shower and a $12,000 one can look similar on paper until you get into what’s behind the tile. We build every shower on a proper waterproofing substrate – the Schluter system being the one we reach for most – because a tiled shower that skips that step is a tiled shower that leaks in five to seven years. That integration from waterproofing to finish tile is the detail most remodelers skip, and it’s the one homeowners pay for later. It’s also the reason our shower pricing holds up when other quotes look lower up front.
What Affects Bathroom Remodel Pricing in Paradise
Paradise sits in the Las Vegas Valley, and a few things about building here move the needle in ways they don’t in other markets.
- Hard water and mineral scale. Valley water is notoriously hard, and we see the evidence in every older bathroom we open up – crusted showerheads, calcified valves, and tile grout that’s taken a beating. That scale sometimes means extra work to bring valve bodies and drain assemblies back to spec, and it’s the strongest argument we can make for specifying a Kohler or Grohe fixture with replaceable cartridges instead of an off-brand that will seize up in three years.
- Older housing stock and hidden surprises. Parts of Paradise were built in the 1970s through the 1990s, and a bathroom from that era often hides surprises behind the drywall – a slow leak under the tub, a drain line that’s not where the drawing says, or a vent that’s been covered over. We budget for what we can see and plan for what we can’t; surprises in a 40-year-old bathroom are the single biggest reason a remodel moves toward the top of the range.
- Tile versus composite surround. A prefab shower surround is faster and cheaper; a fully tiled shower with Schluter waterproofing costs more but lasts the life of the house. The gap between those two decisions is often the whole difference between a $9,000 job and a $20,000 one.
- Moving plumbing. Keeping the toilet, sink, and shower where they are keeps the price down. Relocating a drain or supply line means opening walls, re-sloping waste lines, and re-inspecting – all legitimate cost, and all worth planning before demo starts.
- Finish level and material choice. A porcelain-tile floor and a mid-grade vanity live comfortably in a $12,000 bathroom. Cambria quartz counters, floor-to-ceiling large-format tile, and a freestanding tub push it toward $28,000. There’s no wrong answer here; there is a budget answer and a forever answer.
- Waterproofing and inspection. Clark County inspects plumbing and electrical work, and a bathroom that adds a wet area or moves drain lines needs to pass. The permit and inspection steps aren’t optional, and they’re baked into any honest quote – including ours.
How to Save on a Bathroom Remodel in Paradise
You don’t have to accept the top of the range. A handful of decisions reliably pull a Paradise bathroom toward the lower half of the price window without sacrificing the parts that matter.
- Keep the layout. Leaving the toilet, sink, and tub where they are is the single biggest lever. You avoid moving drains, opening extra walls, and re-inspecting plumbing you didn’t touch.
- Spend on the wet area, save on the rest. Put your money into waterproofing, the shower valve, and a vanity that won’t swell – then choose a standard porcelain tile instead of a designer slab. Nobody suffers from a mid-grade tile; everybody suffers from a leaking shower.
- Repair the tub instead of replacing it when the shell is sound. If your tub is structurally fine and the finish is just worn, a refinish can be a fraction of a shower replacement. If the shell is cracked or the drain is failing, replacement wins.
- Right-size the vanity. A standard single-sink vanity in the $800 to $1,500 range does the job. Custom cabinetry is worth it in a primary bath, less so in a hall bath or guest bathroom.
- Bundle exterior work with the interior. If a roof or window replacement is coming up anyway, coordinating it with a bathroom remodel through one contractor can trim scheduling and mobilization costs. From roofline to paver, we handle both sides in-house.
We offer free estimates and walk every job through the numbers before a single tile is ordered – call (888) 445-6077 and we’ll put a real range in front of you.
FAQs – Bathroom Remodel Cost in Paradise
How much does a bathroom remodel cost in Paradise, NV?
A full bathroom remodel in Paradise runs $9,000 to $28,000, with a small bathroom remodel at $5,000 to $12,000. The exact figure depends on footprint, plumbing changes, and finish level. Call (888) 445-6077 for an exact quote – estimates are free.
Can I remodel a bathroom for under $10,000 in Paradise?
Yes. A small bathroom remodel in the $5,000 to $12,000 range is realistic when you keep the layout, choose a standard porcelain tile, and update the vanity and fixtures rather than moving plumbing. Keeping the wet area where it is and choosing a prefab shower surround over a fully tiled one are the two biggest levers. Call (888) 445-6077 and we’ll tell you honestly which line items you can trim.
Is it cheaper to repair or replace a bathroom shower in Paradise?
Repair is usually cheaper when the shower pan and drain are sound; replacement is cheaper over time when the pan is failing. A shower replacement in the same footprint runs $3,000 to $8,500, while a full walk-in shower installation runs $4,500 to $12,000. If the waterproofing behind the tile has failed, patching the tile just delays a leak. Call (888) 445-6077 for an on-site look – we’ll tell you which one your shower needs.
How much does a walk-in shower cost in Paradise?
A walk-in shower installation in Paradise costs $4,500 to $12,000, and a tub-to-shower conversion runs $3,500 to $10,000. The range depends on tile choice, glass configuration, and whether the plumbing moves. Call (888) 445-6077 for an exact number.
Can you remodel my bathroom in Paradise this week?
Often yes for a consultation, and we can often start a smaller bathroom remodel within a few weeks. Full remodels involving plumbing changes need permit and inspection scheduling, which adds lead time. Call (888) 445-6077 to check current availability and get a free estimate.
One Contractor for the Whole Job
A bathroom remodel is rarely just a bathroom. If the same project touches interior tile and a vanity, or extends to the roof, windows, or hardscaping around the house, working with a single general contractor who covers all of it means you’re not juggling a plumber, a tile setter, and a separate roofing crew and hoping they show up in the right order. Ellsworth Contractors handles kitchen and bath remodels alongside roofing, windows, siding, fencing, pavers, and concrete – one accountable contractor for the entire scope.
That same breadth shows up in the material choices. You’re not limited to what a single supplier pushes. Vanities and cabinetry can come from KraftMaid or Wellborn; countertops from Cambria, Silestone, or Caesarstone; fixtures from Kohler, Grohe, or Toto; and if the project expands into an addition or ADU, our prefab partnerships with Abodu, Dvele, Mighty Buildings, Boxabl, and Plant Prefab let us expand what your property can do without starting from scratch.
We keep the bathroom page focused on bathrooms – bathroom remodeling in Paradise – but the scope doesn’t stop at the door. If the project grows, we’re the same call. Start with an estimate at our home page or call (888) 445-6077.
Written by Kevin Ellsworth, Owner at Ellsworth Contractors, serving Paradise and the Las Vegas Valley.
Pricing reflects the Paradise market as of 2026. Ellsworth Contractors offers free estimates – call (888) 445-6077.
What Our Customers Say
"He was upfront about a soil issue that added cost early rather than absorbing it and surprising us at the end."
— Mark Barrett"He caught an error in the engineer's drawings before it got framed, which would have been an expensive thing to discover later."
— Hector Castillo"Weekly site meeting, every week, with a written summary afterward. I always knew where the money and the schedule stood."
— Dustin Brooks